An artist’s rendering of the proposed changes to the Bolton Landing town pier at Rogers Park.
The Town of Bolton has completed the final phase of the Hamlet Sustainability Plan and invites the public to a presentation of the draft concepts and a vision for the community. The meeting is scheduled for Tuesday, June 30 at 7:00 p.m.at the Bolton Town Hall.
A formal presentation of the master plan is scheduled for 7:20 p.m. and will be followed by an exchange of comments and questions. Attendees will be encouraged to come at 7:00 p.m. to review the drawings.
The format for the event is to introduce the public to the project through the various draft concepts and drawings for Rogers Memorial Park and Town Pier, the Lake Shore Drive Streetscape, Veteran’s Park, and Norowal Marina.
For those unable to attend the meeting, you may follow the progress of the Bolton Landing Hamlet Sustainability Plan through the Town’s website: http://town.bolton.ny.us
See a full scale version of the picture above of the Rogers Park proposed pier here (This is a large download: 5 MB’s)
I think the best thing from a Huletts’s perspective is increased public boat docking if people want to go down to Bolton to visit or shop.